Reference · CMS calculator

How the containment calculator works

Left to right: the documents it reads, the tables it keeps from them, the rules that shape them, the checks that run, and the verdict. Every box opens the page that says where it came from and how it is used.

← back to the calculator

Solid: what 4 × 4c 95mm² on a 600 mm wide ladder, cleated, with a fault current, leans on.

Solid: what a trunking run of 12 × 1c 6mm², 6 × 1c 10mm², 4 × 1c 16mm² leans on.

Everything in the CMS section, whether a run touches it or not.

Documents we readTables we keepRulesChecksThe verdict Legrand Swifts — 6 documentsLegrand Swifts6 documents Ellis Patents — 5 documentsEllis Patents5 documents Prysmian — 2 documentsPrysmian2 documents Cable makers — 1 documentCable makers1 document Conduit — 3 documentsConduit3 documents Our own — 3 documentsOur own3 documents Standards & guidance — 4 documentsStandards & guidance4 documents Cable catalogue — every cable offered, 13 familiesCable catalogueevery cable offered, 13 families Trunking net internal areas — trunking sizesTrunking net internal areastrunking sizes Duct bore areas — duct sizes, derivedDuct bore areasduct sizes, derived Ladder widths and sections — Swifts ladderLadder widths and sectionsSwifts ladder Tray sizes — tray widths and depthsTray sizestray widths and depths Wire basket sections — Cablofil basketsWire basket sectionsCablofil baskets Conduit and cable factors — GN1 methodConduit and cable factorsGN1 method Flexible conduit inside areas — Adaptaflex PA, SPL, SPFlexible conduit inside areasAdaptaflex PA, SPL, SP Oval conduit inside sizes — three sizesOval conduit inside sizesthree sizes Cleat catalogue — three cleat rangesCleat cataloguethree cleat ranges Cleat short-circuit tests — tests, as publishedCleat short-circuit teststests, as published Ladder bend fittings — radii and familiesLadder bend fittingsradii and families Gland lengths — one maker’s tableGland lengthsone maker’s table Insulation thickness — core spacing · disputed rowsInsulation thicknesscore spacing · disputed rows Formation constants K — per formationFormation constants Kper formation Rung and slot geometry — Type 1 rungRung and slot geometryType 1 rung Ladder rail heights — three familiesLadder rail heightsthree families Space factor — trunking, ductSpace factortrunking, duct Flexible conduit fill — the maker’s ruleFlexible conduit fillthe maker’s rule Oval conduit fill — our assumptionOval conduit fillour assumption Future spare — kept clearFuture sparekept clear Layout spacing — touching to 2DLayout spacingtouching to 2D The no-clash rule — body to bodyThe no-clash rulebody to body Bending radius basis — 8 × O.D. by defaultBending radius basis8 × O.D. by default Radius allowance — an estimateRadius allowancean estimate The force on a cleat — F′ = K · Iₚₖ² / SThe force on a cleatF′ = K · Iₚₖ² / S Power cables only — up to five coresPower cables onlyup to five cores The drop’s datum — rung top to gland plateThe drop’s datumrung top to gland plate Segregation bands — BS 7671 528.1Segregation bandsBS 7671 528.1 Fill by area — trunking, duct, groupedFill by areatrunking, duct, grouped Fill by width — tray, ladder, basketFill by widthtray, ladder, basket Conduit factors — the GN1 methodConduit factorsthe GN1 method Bends — radius and fittingsBendsradius and fittings Cable weight — advisoryCable weightadvisory Segregation — advisorySegregationadvisory Cable cleat check — ladderCable cleat checkladder Bolts in the slots — advisoryBolts in the slotsadvisory The drop — ladderThe dropladder The calculator — PASS / FAIL, advisoriesThe calculatorPASS / FAIL, advisories
leaned on by the run shownin the library, not used by it

Documents

Tables we keep

  • Cable catalogue — Every cable the schedule can pick, with the dimensions the sizing, the bend check and the cleat check read.
  • Trunking net internal areas — The cross-section each trunking size offers before the space factor is applied.
  • Duct bore areas — The bore of each duct, worked out as a circle from its internal diameter.
  • Ladder widths and usable sections — Each ladder size’s inside width — what a laid run is measured against — and the usable section a grouped run is sized on.
  • Tray sizes — The tray widths and depths, and which of them the maker actually makes.
  • Wire basket sections — The wire basket sizes: width × height from the workbook, and the useful section the maker publishes for the shallow ones.
  • Conduit and cable factors — The factors the conduit method adds up: one per cable, one per conduit, for a run’s length and bends.
  • Flexible conduit inside areas — The inside area of every size of the maker’s flexible conduit ranges the calculator offers — what its fill rule is a share of.
  • Oval conduit inside sizes — The inside width and height of each oval size, and the inside area worked out from them as a rectangle with round ends.
  • Cleat catalogue — Every cleat the calculator can propose or be given, with the dimensions the drawings and the arrangement read.
  • Cleat short-circuit declarations — What each cleat range has survived, and under which conditions — a bound on the duty, not a spacing.
  • Ladder bend fittings — The bend fittings each ladder family is made in — which radius a turn can take off the shelf.
  • Gland lengths — How far a gland stands outside the plate, which the drop adds to the height a cable needs.
  • Insulation thickness — The insulation on one conductor, by size — it sets how far apart the cores sit, which sets the force between them.
  • Formation constants K — The constant the force law takes for each way the conductors can lie.
  • Rung and slot geometry — The rung every cable and cleat stands on, and the slots its bolts go through.
  • Ladder rail heights — How deep each ladder family’s rails are, and how far up them the rung sits.

Rules

  • Space factor — How much of a closed section the cables may fill — the rest is the room that lets them be drawn in and stay cool.
  • Flexible conduit fill — How much of a flexible conduit’s cross-section the cables may take — the maker’s rule, for three or more cables: of the inside area on PA and SP, of ABB’s fill value on SPL.
  • Oval conduit fill — How much of an oval conduit’s inside area the cables may take. No maker or standard publishes a figure, so this one is the calculator’s own, changeable per run.
  • Future spare — The part of every size kept clear for cables added later — Sparkline’s default, none on conduit, changeable per run.
  • Layout spacing — How much width each cable takes when laid in a single layer, touching or spaced.
  • The no-clash rule for cleats — How close two cleats, or a cleat and a cable, may stand across a rung — the rule every arrangement and every drag obeys.
  • Bending radius basis — Which minimum radius a cable is bent at: its catalogue figure, or a multiple of its diameter.
  • Allowance over the minimum radius — An optional margin over the minimum radius — derived, because the cable maker publishes no figure for LV cable.
  • The force on a cleat — The force a fault puts on each cleat, and from it the longest gap a cleat can hold — rounded down to whole rungs.
  • Power cables only — Only cables that can carry the run’s fault current are force-checked; a cable of more cores is a control cable.
  • The drop, measured from the rung top — Where the height a cable needs on its way into a switchboard is measured from, and what it is made of.
  • Segregation bands — Which cables may share a containment: power, data and fire alarm, by voltage band.

Checks

  • Fill by area — The sizing check for a closed section, or a pile: the cables’ areas against the usable area — trunking, duct, flexible and oval conduit, a grouped open run.
  • Fill by width — The sizing check for a single layer: the width the cables and their spacing take against the usable width.
  • Conduit factors — The conduit check: the cables’ factors against the conduit’s, for its length and bends.
  • Bends — Whether every cable can turn inside the containment’s bends, and which fitting that needs.
  • Cable weight — The weight the cables put on the containment, per metre, for the supports to be checked against.
  • Segregation — Whether cables of different bands share the containment without a barrier.
  • Cable cleat check — The maximum spacing of cleats for the run’s fault current, and whether the run as laid is inside it.
  • Cleat bolts in the rung slots — Whether each cleat’s bolts land in the rung’s slots, or on the metal between them.
  • The drop into a switchboard — The height the cables need between the ladder and a board’s gland plate.