When Do You Need Support Calculations?

Every wiring system must be supported so that it will not collapse early in a fire. BS 7671 Regulation 521.10.202 applies to the whole installation, not only escape routes. Where circuits must keep working in a fire, such as life-safety and fire-fighting systems, the supports must hold for the duration the project's fire strategy sets for those circuits. BS 8519 is the code of practice for these fire-resistant cable systems.

Contractors and designers usually need calculations when electrical and mechanical services share one support, when tiers are stacked, when supports hang from a deck or steelwork, or when the specification asks for evidence that the supports comply.

We Check the Whole Support Network

Real supports are networks, not single trapezes: headers carry channel legs, rods hang from bearers, and cable tray, pipework and ductwork share one fixing. We follow the load from every service through each element down to the fixing in the structure, so a shared header or a leg carrying two bearers is checked for everything it really holds.

Elevation of a support network. An upper bracket of two drop rods fixed to the slab and a channel carries a cable ladder with a fire-rated circuit. A lower channel carries insulated ductwork and a water-filled pipe; it hangs on one drop rod from the underside of the upper bracket's channel and on a second, longer drop rod fixed to the slab. Loads point down and reactions point up at the three fixings in the slab.Elevation of a support network. An upper bracket of two drop rods fixed to the slab and a channel carries a cable ladder with a fire-rated circuit. A lower channel carries insulated ductwork and a water-filled pipe; it hangs on one drop rod from the underside of the upper bracket's channel and on a second, longer drop rod fixed to the slab. Loads point down and reactions point up at the three fixings in the slab.
One rod hangs from the channel of the bracket above, the other from the slab. Every service is followed through the channels to each fixing, and the reaction at each fixing is given for the structural engineer. Open full size

Pipework and Ductwork

We check hangers, brackets and multi-service racks for mechanical services as well: pipework with the water it carries, its insulation, valves and fittings, and ductwork with its insulation. Forces at pipe anchors and guides from thermal movement are taken from the mechanical designer.

Where pipework or ductwork shares a support with fire-rated cables, the whole support is checked for the fire duration — the pipes and ducts still hang from it in a fire.

We provide a full report with the calculations: the loads on each support, every check at normal conditions and in fire, and the reactions at the fixings.

Large ductwork and pipes hung from strut-channel frames on drop rods along the ceiling of a service corridor.
Ductwork and pipework on heavy strut-channel frames in a service corridor. Photo: MTA Capital Construction Mega Projects, CC BY 2.0, cropped

Normal Conditions and Fire

At normal temperature we check strength and deflection against the manufacturer's published capacities. In the fire case every service still hangs from the supports while the steel loses most of its strength, so we check against the manufacturer's fire-test capacities for the required duration. A support carries the rating of the most demanding circuit on it: one fire-rated basket low down sets the rating for everything above it.

Fire usually governs. A rod or channel working at a small part of its capacity at normal temperature can be close to its limit at 120 minutes. Where an element fails, we say what replaces it — for example a channel leg instead of a drop rod.

Two bars for the same drop rod: a short bar at normal temperature and a long bar close to the capacity line in fire.Two bars for the same drop rod: a short bar at normal temperature and a long bar close to the capacity line in fire.
Illustrative only: steel loses most of its strength in fire while the load stays the same. Open full size

Cable Pulling and Short-Circuit Forces

Supports are only part of a cable route. For large cables we also calculate the forces on the cables themselves: while they are pulled in, and when a short circuit drives them apart.

Cable Pulling

We calculate the pulling tension along the route and the side-wall pressure at each bend, allowing for friction on the rollers and the containment. Then three checks against the cable manufacturer's limits: the tension stays below the maximum pulling tension, the side-wall pressure stays below its maximum, and no bend is tighter than the minimum bending radius. The result shows which end to pull from and the tension the winch must not exceed.

Cleats and Short-Circuit Forces

We calculate the force between single-core cables during a short circuit from the peak fault current, and check it against each cleat's tested short-circuit withstand. The result is the maximum cleat spacing for trefoil or flat formation, and the cleat to use.

Ladder and Tray Loading

We check the weight of the cables against the safe working load of the ladder or tray at the support spacing, so the containment is checked as well as its supports.

The peak fault current comes from the fault level calculation or the protection study. For the background, read our guide to cable cleat spacing and short-circuit forces.

What We Check

  • Loads from every service: cables, tray, pipework full of water, insulation and ductwork
  • Drop rod tension at normal temperature and in fire, against the manufacturer's tested capacities
  • Bending strength of channel, brackets and headers
  • Deflection at normal conditions
  • Channel nuts, fittings and connections
  • Fixings and anchors into concrete, deck or steelwork
  • A load balance: the reactions at the fixings add up to the load applied
  • Cable pulling tension and side-wall pressure, against the cable manufacturer's limits
  • Short-circuit forces on cleats, and the maximum cleat spacing
  • Ladder and tray loading at the support spacing

Evidence a Checker Can Follow

Every capacity in the calculation is traced to its source: fire-test data from the approved product submittals rather than catalogue figures, and anchor capacities from the product's European Technical Assessment (ETA), including its fire resistance. Every calculation shows its inputs, formulas and results, so a checker can follow every number.

Assumptions and exclusions are stated on the front sheet. The capacity of the slab, deck or steelwork above is for the structural engineer — we give the reactions at every fixing. Anchor proof testing on site to BS 8539 is carried out by the installer — we give the design loads.

What You Receive

  • A full report with the calculations (PDF) for each support type or zone
  • An evidence register naming the source of every capacity used
  • Marked-up support details, showing any element that must change
  • The reactions at each fixing, for the structural engineer
  • A list of the values to confirm on site
  • Cable pulling and cleat spacing calculations, where the job needs them

What We Need From You

  • Containment layouts and sections, or views from the BIM model
  • The cables on each route: types, sizes and numbers
  • Pipework and ductwork on the supports: sizes, materials, contents and insulation
  • Any anchor or guide forces from the mechanical designer
  • Support details: rod sizes, channel types, fixings and spacing
  • The fire rating each circuit needs
  • Product submittals, or the manufacturer you plan to use
  • For pulling and cleat checks: the cable routes with their bends, and the fault level or the protection study

Relevant Standards

  • BS 8519:2020
  • BS 7671:2018+A4:2026
  • BS EN 61537
  • BS 8539:2012+A1:2021
  • BS EN 1992-4
  • BS EN 61914

Need the support layouts drawn as well? See our drawings and schematics service. For the cables themselves, see ProDesign cable calculations.

Frequently Asked Questions

Common questions about containment and mechanical supports.

Do you check pipework and ductwork supports?

Yes. We check hangers, brackets and shared racks for pipework and ductwork, including the water in the pipes and the insulation. Where they share a support with fire-rated cables, the whole support is checked for the fire duration.

Which fire duration do you check?

The duration the project's fire strategy sets for the most demanding circuit on the support — often 30, 60 or 120 minutes. Everything else on that support is checked for the same duration.

Do cable supports need to be fire rated?

BS 7671 Regulation 521.10.202 requires every wiring system to be supported so that it will not collapse early in a fire. Where circuits must keep working in a fire, the supports must hold for the duration the project's fire strategy sets, which we check against the manufacturer's tested fire performance.

Why does the fire case usually govern?

Steel loses most of its strength at fire temperatures while the load stays the same: every cable and tray still hangs. A rod working at a small part of its capacity at normal temperature can be close to its limit after 120 minutes.

Can you work with any manufacturer's products?

Yes, where the manufacturer publishes tested data for the products, including fire-test data for the duration needed. The evidence register names the source of every capacity.

Do you check the structure the supports hang from?

No. We give the reactions at every fixing so the structural engineer can confirm the slab, deck or steelwork. Anchor proof tests on site to BS 8539 are carried out by the installer, using the design loads we give.

Can you check supports that are already installed?

Yes. Send photos, dimensions and the cable routes, and we check the existing supports and say which elements need to change.

Do you calculate cable pulling tensions and cleat spacing?

Yes. For large cables we calculate the pulling tension and the side-wall pressure at each bend, and the short-circuit force between cleated cables, which sets the maximum cleat spacing. Both are checked against the manufacturers' data for the cable and the cleat.

Do you produce the support drawings?

We mark up the support details with any changes. Full support layouts and sections in AutoCAD are available through our drawings and schematics service.

Need Support Calculations?

Send the containment layouts and cable routes — we'll confirm the scope, the inputs we need, and the cost.

Get a Quote