We produce cable sizing calculations and protection coordination studies for electrical
contractors and consultancies that don't have an in-house
Trimble ProDesign (formerly Amtech ProDesign)
licence or designer. You send us the design information; we return a submission-ready,
BS 7671-compliant calculation pack — typically within days, not weeks.
ProDesign and Trimble PowerNet are accepted
across UK infrastructure programmes including rail, aviation and energy projects, as well as
commercial and industrial buildings. Every calculation is verified against BS 7671 and the
relevant sector standards.
Cable Sizing to BS 7671
A compliant cable calculation is more than picking a size from a table. For every circuit we
check current-carrying capacity with the correct installation method and grouping factors,
voltage drop across the whole network, earth fault loop impedance against disconnection times,
and the adiabatic (thermal withstand) requirement for fault conditions. ProDesign models the
complete distribution network, so a change at the supply end automatically re-validates every
downstream circuit — the errors that slip through spreadsheet calculations don't survive here.
Protection Coordination & Discrimination
We produce protection coordination studies with time–current curves showing discrimination
between upstream and downstream devices, fault level calculations to BS EN 60909 (3-phase and
single-phase), and short-circuit protection verification. For HV systems and larger networks
we use Trimble PowerNet for load flow and network analysis.
What You Receive
- Cable sizing calculation reports (individual circuits and full distribution networks)
- Protection coordination studies (discrimination analysis, time-current curves)
- Load flow analysis and power factor assessment
- Fault level calculations (3-phase and single-phase fault currents)
- Short-circuit protection verification
- Voltage drop assessment throughout the network
- PDF calculation packs formatted for client and approval authority submission
Who This Is For
Electrical contractors pricing or delivering design-and-build work without a ProDesign licence,
consultancies needing overflow calculation capacity, and project teams needing an existing
Amtech/ProDesign model updated. Typical applications include underground rail and station LV
distribution, airport terminal and airside systems, EHV cable system supporting calculations,
and commercial, industrial and mixed-use buildings.
Relevant Standards
- BS 7671:2018+A2:2022
- IEC 60364
- BS EN 60909
- Engineering Recommendation P9
- LU, HAL & HS2 project standards
Cable and fault level calculations often feed directly into earthing design — see our
earthing study design service, read our guide to
cable sizing to BS 7671: spreadsheets vs ProDesign,
or check typical calculation pack prices.