What the site uses now
We start from real data — half-hourly meter data, bills or load logging — to find the maximum demand and the headroom against the agreed supply capacity.
Will the supply carry the new load? A study of your site's capacity, the connection options and their likely cost — before you commit to EV charging, heat pumps, solar, batteries or a new building.
Before you apply to the DNO or commit to a design: adding EV charge points or heat pumps, electrifying a site, adding solar or batteries, extending a building or planning a new development. The study tells you how much capacity you have, what the new load needs, and the realistic routes to get there.
01
We start from real data — half-hourly meter data, bills or load logging — to find the maximum demand and the headroom against the agreed supply capacity.
02
We add the new loads with diversity, phase by phase: EV chargers, heat pumps, kitchens, process loads, solar and batteries.
03
We model the network in ProDesign, ETAP or PowerFactory and check cables, switchgear, transformers and fault levels with the new load. Where solar is part of the plan, PVsyst gives the expected yield.
Where the existing supply is not enough, we set out the options: an increase in capacity from the DNO, a new or upgraded substation, a connection by an independent connection provider (ICP), load management, or a battery to cover peak demand. For each option we give a rough cost, the programme and the risks, and we recommend one. We check both the peak import and, where there is generation or storage, the peak export, and cover export limits under EREC G99 and G100.
Once you have chosen an option, see our ProDesign cable calculations, protection studies and solar PV and battery design.
Common questions about capacity and feasibility studies.
A budget estimate is the network operator's rough price for a connection. Our study looks at the whole site — what you use now, what you will add, what your own installation can carry and every route to the capacity you need — so you apply for the right connection.
Not always. Many studies are done from meter data, drawings and photos. Where records are missing we arrange a survey or load logging, and we say so before we start.
Sometimes. A battery can cover short peaks, for example from EV chargers, so the site stays within its agreed capacity. The study shows whether the peaks are short enough for that to work, and compares the cost with an upgrade.
ProDesign, ETAP or PowerFactory for the network model, and PVsyst for solar yield.
Yes. We work out how many chargers the site can take now, how many with load management, and what an upgrade would add.
You choose an option. We can then prepare the DNO application information, and the detailed design, calculations and drawings for it.