When Do You Need a Feasibility Study?

Before you apply to the DNO or commit to a design: adding EV charge points or heat pumps, electrifying a site, adding solar or batteries, extending a building or planning a new development. The study tells you how much capacity you have, what the new load needs, and the realistic routes to get there.

How We Work It Out

01

What the site uses now

We start from real data — half-hourly meter data, bills or load logging — to find the maximum demand and the headroom against the agreed supply capacity.

02

What you plan to add

We add the new loads with diversity, phase by phase: EV chargers, heat pumps, kitchens, process loads, solar and batteries.

03

What the installation can carry

We model the network in ProDesign, ETAP or PowerFactory and check cables, switchgear, transformers and fault levels with the new load. Where solar is part of the plan, PVsyst gives the expected yield.

A day's demand profile: existing demand in grey, the new load on top in violet, and a dashed line for the agreed supply capacity, with the early-evening peak rising above it.A day's demand profile: existing demand in grey, the new load on top in violet, and a dashed line for the agreed supply capacity, with the early-evening peak rising above it.
Illustrative day: where the new load pushes the peak above the agreed capacity, the study sets out how to deal with it. Open full size

Connection Options and Cost

Where the existing supply is not enough, we set out the options: an increase in capacity from the DNO, a new or upgraded substation, a connection by an independent connection provider (ICP), load management, or a battery to cover peak demand. For each option we give a rough cost, the programme and the risks, and we recommend one. We check both the peak import and, where there is generation or storage, the peak export, and cover export limits under EREC G99 and G100.

Decision flow: if the existing headroom covers the new load, connect after the network check; if not, check whether load management or a battery covers the peak; if not, compare supply upgrade options by cost, programme and risk.Decision flow: if the existing headroom covers the new load, connect after the network check; if not, check whether load management or a battery covers the peak; if not, compare supply upgrade options by cost, programme and risk.
How the study reaches a recommendation. Open full size

What You Receive

  • A feasibility report with the existing maximum demand and the headroom
  • The future load, with diversity, for each phase of the project
  • A network check of cables, switchgear and transformers with the new load
  • Options with rough cost, programme and risks, and a recommendation
  • A single-line diagram of the recommended option
  • A solar yield estimate in PVsyst, where solar is included
  • The technical information for the DNO application

What We Need From You

  • Half-hourly meter data or recent electricity bills
  • The agreed supply capacity, if known
  • The existing single-line diagram or board schedules, if available
  • The loads you plan to add, and when
  • For batteries or generation: the expected consumption and operating profile
  • A site plan showing the intake and where the new loads go
  • Any DNO correspondence or budget estimate

Relevant Standards

  • BS 7671:2018+A4:2026
  • BS EN 61439-2
  • ENA EREC G98
  • ENA EREC G99
  • ENA EREC G100
  • IET Code of Practice for EV Charging Equipment Installation
  • LU S1069
  • LU S1109
  • LU S1909
  • LU S1911

Once you have chosen an option, see our ProDesign cable calculations, protection studies and solar PV and battery design.

Frequently Asked Questions

Common questions about capacity and feasibility studies.

How is this different from a DNO budget estimate?

A budget estimate is the network operator's rough price for a connection. Our study looks at the whole site — what you use now, what you will add, what your own installation can carry and every route to the capacity you need — so you apply for the right connection.

Do you need to visit the site?

Not always. Many studies are done from meter data, drawings and photos. Where records are missing we arrange a survey or load logging, and we say so before we start.

Can a battery avoid a supply upgrade?

Sometimes. A battery can cover short peaks, for example from EV chargers, so the site stays within its agreed capacity. The study shows whether the peaks are short enough for that to work, and compares the cost with an upgrade.

Which software do you use?

ProDesign, ETAP or PowerFactory for the network model, and PVsyst for solar yield.

Can you help with EV charging for a fleet or car park?

Yes. We work out how many chargers the site can take now, how many with load management, and what an upgrade would add.

What happens after the study?

You choose an option. We can then prepare the DNO application information, and the detailed design, calculations and drawings for it.

Planning New Load on a Site?

Tell us what you want to add and where — we'll confirm the scope, the data we need, and the cost.