Check · CMS calculator
Conduit factors
publishedcms.check.conduitFactor
The conduit check: GN1's factor method rather than a space factor.
Local graph
publishedestimateda choiceno sourceArrows: the way the data flows
How the calculator uses it
It adds up the cables' factors and finds the smallest conduit whose factor covers them for the run's length and bends, once the future spare has come off the conduit's factor. The worked example shows the size below the one chosen: it takes the cables, but not with the spare kept clear.
Worked through on A conduit run — 2.5 m straight, no bends, a 30 % future spare typed in (a conduit starts with none)
| 6 × LSOH 1c 2.5mm² | cable factor 43 each, from Table A1 |
|---|---|
| 3 × LSOH 1c 4mm² | cable factor 58 each, from Table A1 |
| Their sum | 432 |
| 20 mm conduit | factor 460 × (1 − 30 % future spare) = 322 — too small for 432 |
| 25 mm conduit | factor 800 × (1 − 30 % future spare) = 560 — covers 432 |
| The conduit the engine chose | 25 mm — the smallest whose factor, less the future spare, covers the cables (Table A2) |
| Verdict | PASS |
Computed by the calculator for this run when this page was generated — not typed. The factors shown are only the cells this run used.