Document · Selectivity Study
Selectivity coordination guide
publishedsel.doc.lvped318033en
The tested pair limits and the conditions that must hold before a limit is usable.
Local graph
publishedestimateda choiceno sourceArrows: the way the data flows
The original document
- Publisher
- Schneider Electric
- Title
- LVPED318033EN — Selectivity coordination guide
- Edition
- September 2026, v4.0
- Where in it
- A-6–A-9; tables A-17–A-117; worked example A-66
- Do we hold it
- Owner’s local copy; not distributed
- May it be reproduced here
- In small extracts, quoted with acknowledgement. The document is the authority.
Schneider document download ↗ We are not the source of record.
What the document says
“Selectivity tables are provided with “Standard” setting.”
How the calculator uses it
What the study keeps
The study retains the portions needed by Guide tables; Residual-current coordination; Earth faults. Each retained dataset or method keeps the original source locator.
The source is used for the tested pair limits and the conditions that must hold before a limit is usable. Follow the connected nodes to see the actual retained data and method, then the live worked result below.
VERIFY
Check September 2026, v4.0 against the actual device and current manufacturer instructions. Source pages: A-6–A-9; tables A-17–A-117; worked example A-66.
Worked through on the guide’s A-66 example
| Pair | ComPacT NSX100F TM100D → Acti9 iC60N C32 |
|---|---|
| Fault level at downstream board | 10 kA |
| Phase verdict | Selective up to 1 kA (Schneider p. A-66). The fault level is 10 kA. |
| Phase status | fail |
Computed by the calculator for this run when this page was generated — not typed.