Rule · Selectivity Study
Breaking-capacity bound
estimatedsel.rule.capacity-bound
A result cannot pass above the downstream breaking capacity. Reg 434.5.1 requires back-up protection there; this study does not verify it.
Local graph
publishedestimateda choiceno sourceArrows: the way the data flows
How the calculator uses it
What the study keeps
The resolved downstream Icu and the downstream board fault level; an unknown capacity stays unknown.
The study caps a phase or earth result at the device’s breaking capacity. Even a total tested pair result becomes review when the entered fault exceeds that capacity. See BS 7671 selectivity references, Device bands and hot upstream.
VERIFY
Confirm the actual performance version and voltage. Back-up protection and cascading are outside this study’s verdict.
Worked through on DNO-fed route
| Pair | BS 88-3 100 A fuse → ComPacT NSXm F TM100D |
|---|---|
| Fault level at downstream board | 16 kA |
| Phase verdict | Not selective from 580 A to 1.45 kA: the bands overlap. Probably from 126 A (an edge that is not published). |
| Phase status | fail |
| VERIFY from this run | Upstream fuse fastest edge: IEC 60269-1 gG gates (VERIFY). |
| Pair | ComPacT NSXm F TM100D → Acti9 iC60H B16 |
| Fault level at downstream board | 4.2 kA |
| Phase verdict | Total selectivity (Schneider p. A-62: T), up to the downstream device's breaking capacity. |
| Phase status | pass |
Computed by the calculator for this run when this page was generated — not typed.