Rule · Selectivity Study

Breaking-capacity bound

estimated

sel.rule.capacity-bound

A result cannot pass above the downstream breaking capacity. Reg 434.5.1 requires back-up protection there; this study does not verify it.

Local graph

Leans on · 2Leaned on by · 1BS 7671 selectivity references — derived from, publishedBS 7671 selectivityreferencesderived fromDevice bands and hot upstream — derived from, estimatedDevice bands and hotupstreamderived fromPhase faults — used to derive, estimatedPhase faultsused to deriveBreaking-capacitybound Leans on · 2Leaned on by · 1BS 7671 selectivity references — derived from, publishedBS 7671selectivityreferencesderived fromDevice bands and hot upstream — derived from, estimatedDevice bands andhot upstreamderived fromPhase faults — used to derive, estimatedPhase faultsused to deriveBreaking-capacity bound Leans on · 2Leaned on by · 1BS 7671 selectivity references — derived from, publishedBS 7671selectivityreferencesderived fromDevice bands and hot upstream — derived from, estimatedDevice bandsand hotupstreamderived fromPhase faults — used to derive, estimatedPhase faultsused to deriveBreaking-capacity bound

publishedestimateda choiceno sourceArrows: the way the data flows

See it in the whole calculator

How the calculator uses it

What the study keeps

The resolved downstream Icu and the downstream board fault level; an unknown capacity stays unknown.

The study caps a phase or earth result at the device’s breaking capacity. Even a total tested pair result becomes review when the entered fault exceeds that capacity. See BS 7671 selectivity references, Device bands and hot upstream.

VERIFY

Confirm the actual performance version and voltage. Back-up protection and cascading are outside this study’s verdict.

Worked through on DNO-fed route

PairBS 88-3 100 A fuse → ComPacT NSXm F TM100D
Fault level at downstream board16 kA
Phase verdictNot selective from 580 A to 1.45 kA: the bands overlap. Probably from 126 A (an edge that is not published).
Phase statusfail
VERIFY from this runUpstream fuse fastest edge: IEC 60269-1 gG gates (VERIFY).
PairComPacT NSXm F TM100D → Acti9 iC60H B16
Fault level at downstream board4.2 kA
Phase verdictTotal selectivity (Schneider p. A-62: T), up to the downstream device's breaking capacity.
Phase statuspass

Computed by the calculator for this run when this page was generated — not typed.