Check · Selectivity Study

RCD pair

published

sel.check.rcd-pair

Compare residual sensitivity and holding versus breaking time; report each failed condition. A route without two residual functions has no RCD pair check.

Local graph

Leans on · 1Leaned on by · 1Residual-current coordination — derived from, publishedResidual-currentcoordinationderived fromThe study verdict — used to derive, estimatedThe study verdictused to deriveRCD pair Leans on · 1Leaned on by · 1Residual-current coordination — derived from, publishedResidual-currentcoordinationderived fromThe study verdict — used to derive, estimatedThe study verdictused to deriveRCD pair Leans on · 1Leaned on by · 1Residual-current coordination — derived from, publishedResidual-currentcoordinationderived fromThe study verdict — used to derive, estimatedThe studyverdictused to deriveRCD pair

publishedestimateda choiceno sourceArrows: the way the data flows

See it in the whole calculator

How the calculator uses it

What the study keeps

Only pairs in which both devices have an enabled residual-current function produce this check.

The supplemental residual example compares the sensitivities, upstream delay/type and holding time. rcdPair() reports each unmet condition rather than hiding it behind a single ratio. See Residual-current coordination.

VERIFY

An absent RCD-pair result means the pair did not qualify for the check, not that residual-current coordination was demonstrated.

Worked through on two generic residual devices

PairRCBO type C 63 A (BS EN 61009) → RCBO type B 16 A (BS EN 61009)
Fault level at downstream board4.2 kA
Phase verdictSelective on the curves up to 315 A, where both devices can trip instantaneously. Schneider's guide has no table for this pair, so above that it is indicative.
Phase statusreview
Earth verdictEarth faults: selective on the curves up to 500 A; above that both can trip instantaneously and the guide's tables cover phase faults only (p. A-75 note), so it is indicative.
RCD verdictRCDs selective: 300 mA time-delayed over 30 mA (ratio 10.0, 3:1 of Reg 536.4.1.4), and the upstream holds longer than the downstream takes to break.
VERIFY from this runNo tested table for this pair: the instantaneous zone is indicative (SPE-30 — no definite pass without a definite basis).